The renovation project of the three Southern Connection Railway bridges crossing the Danube can justifiably be called a technical masterpiece. The degraded condition of the two existing steel bridge structures required reconstruction, and a new, third railway bridge had to be installed.
The reconstruction of the bridges had to be carried out in such a way that two-way rail traffic was maintained during the reconstruction. During the reconstruction, the first structure was built, and the second existing structure was disassembled and rebuilt. After that, the third existing structure was disassembled and rebuilt.



The mounting of the track was executed with edilon)(sedra Corkelast® ERS, mainly because almost all bridges crossing the Danube River are fastened with ERS and have proven to be highly durable and virtually maintenance-free. The existing bridges and the new bridges are operated by MÁV Zrt (Hungarian Railway Authority).
The bridges, which are situated on the line between the Eastern Railway Station and Hegyeshalom, are three of the busiest railway connections, crossing the river Danube. The aim of this project is to provide a modern transport alternative in southern Budapest for the residents of the conurbation.
The challenge
The reconstruction of the bridges in such a way that two-way rail traffic was maintained during the reconstruction.
The solution
edilon)(sedra Corkelast® ERS (Embedded Rail System).
The result
Three new, highly sustainable railway bridges.
Order your free copy of our handbook ‘Embedded Rail Systems on Bridges’ here.
More information?
With over 50 years of experience in ballastless track systems, our skilled team leverages deep industry knowledge to support and ensure the success of your railway project.
Have questions about your project, our track systems, or value-added services?